AMICSTL

AMICSTL is a non-profit innovation hub in North City St. Louis that will revolutionize advanced manufacturing and elevate the economic, educational, and community visibility and strength of the entire St. Louis bi-state region. The AMICSTL building is planned and documented on Ranken Technical College property between Newstead Avenue and Pendleton Avenue along Finney Avenue. The Ranken properties have been consolidated and recorded. This project is 89,600 square feet which is situated on both the north and south side of Finney Avenue with a bridge connecting the two. There is a 70-foot right of way centered on Finney Avenue. The building will provide flexible spaces to accommodate special project needs, incubator spaces, offices, collaboration spaces, a multi-purpose space, maker space, and an elevated bridge across Finney Ave. Additional project highlights include (4) hi-bay manufacturing areas; mezzanine for offices and meeting rooms; training rooms; lab spaces under the mezzanine; and a self-service cafe. The building height will reach around 55 feet at its highest point above grade and is cladded in three façade types including curtain wall, aluminum composite metal panel, and a translucent polycarbonate system which maximizes daylight while reducing glare.

Status

Accepting Bids

Prebid Date 1/7/25 2:00pm
Bid Date 1/31/25 5:00pm

Company & Contacts

SLDC
COBALT CONSTRUCTION CONSULTING, Jim Byrne  

Location

4300 Block of Finney Avenue

Proposals Due: January 31, 2025 by 5:00pm Central Time

Contractor is to submit 4 hard copies to Cobalt Construction Consulting’s “NEW” office located at 1706 S Big Bend Blvd, St. Louis, MO 63117. Additionally, please submit a full bid pdf package via email to Jackson Morrissey at
morrissey@cobaltc3.com. Please ensure your submissions are limited to 20mb in size and request a read receipt in your email. Bids will not be accepted after the date/time listed above and it is the bidder’s responsibility to ensure their bid has been received by Cobalt Construction Consulting. If there are any discrepancies between the hard copies and the emailed version, the hard copies will prevail.

Intent to bid notification: December 24, 2024

Prebid meeting: January 7, 2025 (this will be held online)

https://teams.microsoft.com/l/meetup-join/19%3ameeting_YWRjZWZhMGEtYmFhZC00ZTVkLTgzMjEtMTRiYjFmMzg3ZmUx%40thread.v2/0?context=%7b%22Tid%22%3a%22ad00e06a-ea24-4a3e-b4fa-da9b15d395ad%22%2c%22Oid%22%3a%22ba6422fb-9cea-48ad-a81d-3356bf04fba2%22%7d

RFP RFI Submissions Due: 4:00 PM CST, January 14, 2025

RFP RFI Responses: January 17, 2025

Award Project: February 7, 2025

Commence Construction: February 21, 2025