8783- Concrete & Brick RemovalReplacement and Complete Sidewalk Installation; SP-124
The proposed Work includes Replacement of curbs, sidewalk, and other incidental construction in the public right of related to the City’s 50/50 Sidewalk Program. Repairs can be located in in any ward throughout the City.
Plan Holders
Date | Company | Contact |
12/27/24 11:36 am |
Alloy Group
717 Crown Industrial Ct., Ste A-C Chesterfield, MO 63005 |
Jay Giesler
Tel: 6363838328
|
12/25/24 9:44 am |
Dodge Data & Analytics
2860 S State Hwy 161 Ste 160 #501 Grand Prairie, TX 75052 |
Jayalakshmi L
Tel: 413-376-7032
|
12/26/24 2:02 pm |
MoKan
4666 Natural Bridge St. Louis, MO 63115 |
Kabir Muhammad
Plan Room Manager
Tel: 314-454-9675
|
1/7/25 5:42 am |
Vision Civil Construction, LLC
11622 Gravois Road P.O. Box 29246 St. Louis, MO 63126-9998 |
Justin Hurd
PM/ Estimator
Tel: 314-445-2020
|