GRG Bid #2025-004-308IE Brickline Greenway: Grand and Cass Ave. Corridor Improvements (308IE)
Construction of the Grand and Cass Avenue Corridor includes road resurfacing and streetscape improvements on the east side of Grand Boulevard from Natural Bridge to Cass Ave and the north side of Cass Avenue from Grand Blvd to Spring Ave. This scope includes, but is not limited to: earthwork, removals, grading, paving, utility adjustments, street reconfiguration, traffic control, signals, street and pedestrian lighting, sidewalk, curbs, unit pavers, granite, trees, landscaping, and site furniture. The work consists of furnishing all material, labor, tools, equipment, and supervision necessary for the construction of the items noted above in accordance with all the requirements of these specifications, and the drawings made a part thereof. Existing site amenities damaged during construction shall be replaced at no cost to the Owner.
Status
Accepting Bids
Prebid Date | 4/10/25 10:30am |
Bid Date | 5/1/25 2:00pm |
Location
St. Louis, Missouri
Questions should be directed via the solicitation on Bid Express. All requests for clarification
on these bidding documents must be received in writing by April 21st, 2025, at 2:00 P.M.