Public Projects

Bids Due in 22 days
12/13/24 5:00pm
RFQ-Traffic Management Enhancements, Phase 7 - South Broadway (Marceau to Carroll)
Bids Due in 22 days
SLDC
City of St. Louis
Proposed improvements will include signal upgrades and/or enhancements, fiber optic interconnect, traffic monitoring cameras, signal timing and optimization, system integration with the City’s Real-Time Transportation Intelligence Center (TIC), and sidewalk improvements as needed for ADA compliance. The project will be generally located along the South Broadway corridor, from Carroll Street to Marceau Street, a distance of approximately 6.10 miles. Additional improvements outside of the South Broadway corridor may be necessary to provide connectivity to the TIC and redundancy to the City’s fiber optic network.
Bids Due in 22 days
12/13/24 5:00pm
RFQ - Traffic Management Enhancements, Phase 8 - North Broadway (Cass to Riverview)
Bids Due in 22 days
SLDC
City of St. Louis
Proposed improvements will include signal upgrades and/or enhancements, fiber optic interconnect, traffic monitoring cameras, signal timing and optimization, system integration with the City’s Real-Time Transportation Intelligence Center (TIC), and sidewalk improvements as needed for ADA compliance. The project will be generally located along the North Broadway corridor, from Cass to Riverview, and also on Halls Ferry Road, from North Broadway to Veronica Ave. The total project length is approximately 7.4 miles (6.8 miles on the North Broadway corridor and 0.6 miles on Halls Ferry Road). Additional improvements outside of the North Broadway corridor may be necessary to provide connectivity to the TIC and redundancy to the City’s fiber optic network. II.
Bids Due in 26 days
12/17/24 1:45pm
8781- Concrete & Brick Removal Replacement and Complete Sidewalk Installation; SP-122
Bids Due in 26 days
SLDC
St. Louis City, Missouri
The proposed Work includes Replacement of curbs, sidewalk, and other incidental construction in the public right of related to the City’s 50/50 Sidewalk Program. Repairs can be located in Wards 1, 5, and 6.
Bids Due in 5 days
11/26/24 11:00am
SC008333 - JCP North Restroom Improvements
Bids Due in 5 days
UMSL
University of Missouri - St. Louis
Renovation of the JC Penney North building restrooms. This is a separate bid package that will coincide with the JC Penney North Renovation project.
Bids Due in 11 days
12/2/24 11:00am
CDOT WPA Street Reconstruction - 109th, Hoyne, Harding, 102nd
Bids Due in 11 days
Public Building Commission
Bids Due in 5 days
11/26/24 1:00pm
24-018 - Heartland Community College ICB Science Labs Phase 2
Bids Due in 5 days
Demonica Kemper Architects
Cardinal Glennon Children's Hospital BP05
SLDC
Bids Due in 12 days
12/3/24 1:45pm
8780 Concrete & Brick RemovalReplacement and Complete Sidewalk Installation; SP-121
Bids Due in 12 days
SLDC
St. Louis City, MO
Replacement of curbs, sidewalk, and other incidental construction in the public right of way related to the City's 50/50 Sidewalk Program.
Bidding Closed
11/15/24 5:00pm
RFQ - LaurelWaterman Bridge Reconstruction over Metrolink
Bidding Closed
SLDC
City of St. Louis
The City of St. Louis, Board of Public Service, is seeking Statements of Qualifications (SOQs) from firms interested in providing professional engineering services for a bridge replacement project. The project includes the reconstruction of the Laurel/Waterman Bridge over Metrolink and approach pavement, located between DeGiverville Ave to the north and Nina Place to the south.
Bids Due in 12 days
12/3/24 1:45pm
8779 Tower Grove Connector Phase 1
Bids Due in 12 days
SLDC
City of St. Louis
The project will construct a two-way cycletrack along Tower Grove Ave, from Magnolia Ave to Race Course Ave, a distance of approximately one mile. Improvements include new street lighting and traffic signals, ADA-compliant sidewalk and curb ramps, asphalt pavement mill and overlay, enhanced striping, drainage facilities, and landscaping.