RFQ-Traffic Management Enhancements, Phase 7 - South Broadway (Marceau to Carroll)
Proposed improvements will include signal upgrades and/or enhancements, fiber optic interconnect, traffic monitoring cameras, signal timing and optimization, system integration with the City’s Real-Time Transportation Intelligence Center (TIC), and sidewalk improvements as needed for ADA compliance. The project will be generally located along the South Broadway corridor, from Carroll Street to Marceau Street, a distance of approximately 6.10 miles. Additional improvements outside of the South Broadway corridor may be necessary to provide connectivity to the TIC and redundancy to the City’s fiber optic network.
Bid Documents
(click to expand/collapse)
Name | Size | ||
Affidavit of Compliance With Anti-Discrimination Against Israel Act 11-22-23 (1) | 10.4 KB | ||
CMAQ-5422(621) - RFQ | 242.3 KB | ||
CMAQ-5422(621) - TIP application | 5.3 MB | ||
DBE Form (1) | 73.6 KB | ||
E-Verify Affidavit (1) | 38.3 KB |