8786 Relocation of Airfield Mainten. and Snow Removal Equip. Facilit. at STL Lambert Internat Airpor

The proposed Work includes Construction of a new 35-acre campus with (2) main buildings built upon the land totaling 229,491 sq ft of enclosed space. The campus will be equipped with a central stores warehousing facility, administrative space, landscaping ops, auto shops, fueling, salt and sand storage buildings and snow removal equipment (SRE) pre-engineered metal vehicle storage building.

Status

Accepting Bids

Prebid Date 2/11/25 10:00am
Bid Date 3/25/25 1:45pm

Company & Contacts

SLDC
City of St. Louis Board of Public Service, Helen Bryanth  

Location

St. Louis, MO