8786 Relocation of Airfield Mainten. and Snow Removal Equip. Facilit. at STL Lambert Internat Airpor

The proposed Work includes Construction of a new 35-acre campus with (2) main buildings built upon the land totaling 229,491 sq ft of enclosed space. The campus will be equipped with a central stores warehousing facility, administrative space, landscaping ops, auto shops, fueling, salt and sand storage buildings and snow removal equipment (SRE) pre-engineered metal vehicle storage building.
Reference Only (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
8786 Drawings REFERENCE ONLY 26.7 MB
Volume 1 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
8786 Drawings VOL 1 154.3 MB
Volume 2 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
8786 Drawings VOL 2 246.5 MB
Volume 3 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
8786 Drawings VOL 3 124.5 MB
Volume 4 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
8786 Drawings VOL 4 79.4 MB