8786 Relocation of Airfield Mainten. and Snow Removal Equip. Facilit. at STL Lambert Internat Airpor
The proposed Work includes Construction of a new 35-acre campus with (2) main buildings built upon the land totaling 229,491 sq ft of enclosed space. The campus will be equipped with a central stores warehousing facility, administrative space, landscaping ops, auto shops, fueling, salt and sand storage buildings and snow removal equipment (SRE) pre-engineered metal vehicle storage building.
Plan Holders
Date | Company | Contact |
2/19/25 6:08 pm |
AC Environmental, Inc.
PO Box 27 Wilsonville, IL 62093 |
Will Fenton
Tel: 618-570-1587
|
2/21/25 4:20 pm |
Built Solutions, LLC
2818 Locust Street St. Louis, MO 63103 |
David Charles
Business Development Executive
Tel: (314) 584-8276
|
2/21/25 6:31 am |
Dodge Data & Analytics
2860 S State Hwy 161 Ste 160 #501 Grand Prairie, TX 75052 |
Jayalakshmi L
Tel: 413-376-7032
|
2/19/25 1:57 pm |
Kozeny-Wagner, Inc.
951 West Outer Road Arnold, MO 63010 |
Kristen Fels
Tel: 636.296.2012
|
2/20/25 12:15 pm |
MoKan
4666 Natural Bridge St. Louis, MO 63115 |
Kabir Muhammad
Plan Room Manager
Tel: 314-454-9675
|